The Challenge

Power generation facility needed large-diameter stainless exhaust ductwork to mate to existing in-plant flanges during a scheduled outage, with zero tolerance for forced alignment on site.

Our Approach

Manual GTAW welding on 304 stainless, CNC laser cutting, rolling to specified diameters, full factory dry-fit against mating sections before shipment.

The Result

Every section was dry-fit against its mating part in the shop and dropped onto the in-plant flanges on the first attempt, with no forced alignment and no field rework.

Client Requirements

A regional power generation facility needed replacement exhaust ductwork with large-diameter sections that had to mate perfectly to existing in-plant flanges during a scheduled outage. Field alignment was the expensive risk: large-diameter sections had to mate to fixed existing flanges within a fixed outage window, so every section had to fit on the first attempt.

Northern’s Approach

Sheet stock was CNC laser cut to programmed flat patterns, rolled to diameter on our Roundo PS 310 plate roll, then seam-welded with manual GTAW on the long longitudinal passes, tie-ins, and branch fittings, under procedures qualified to ASME BPVC Section IX. Before release, every assembly was fit up dry on the shop floor against its mating section to verify alignment to our inspection drawings. No “we’ll adjust in the field” allowances.

Outcome

Field crews installed the duct run without rework, with sections dropping into position on the first attempt. The facility’s project manager credited the factory dry-fit: every section dropped onto its mating flange without forced alignment or field rework.

From the floor

Capabilities behind this build

The fabrication processes this project drew on. Each one is a service we run in-house.

Batches of formed stainless steel angle brackets with slotted holes stacked on a pallet with inspection tags

Stainless Steel Laser Cutting Services

A 12 kW Trumpf fiber laser cuts stainless sheet and plate up to 1.25 inches thick, a 3,200 W CO2 cell runs production sheet behind it, and an 8-person engineering team programs every nest from your CAD.

Operator forming a stainless steel bracket on a CNC press brake at Northern Manufacturing, with laser-cut blanks staged beside the dies

Precision Bending and Forming Services

Five CNC press brakes, two Trumpf TruBend 5320s among them, form stainless from sheet gauges through heavy plate, with springback compensation set per grade and formed dimensions verified against your CAD model before parts move to welding.

Northern Manufacturing welder running a manual GTAW pass on a stainless steel heat exchanger tubesheet

Stainless Steel Welding Services

60+ AWS-certified welders running ASME BPVC Section IX qualified procedures across nine processes (GTAW, GMAW, FCAW, SAW, robotic, K-TIG, and more) on stainless, duplex, and nickel alloys.

Industries this build serves

How Northern fabricates for the applications this project speaks to.

More documented builds

The requirement, the approach, and the measured result on other Northern projects.

full-penetration circumferential weld on a stainless process pipe at Northern

Process pipe welds, full penetration on every joint

Every joint passed radiography against the piping-package acceptance criteria, with the welder and procedure stamped on each weld map.

A process-piping program needed full-penetration butt welds that would pass radiography on every joint, in a high-chromium austenitic stainless that punishes inconsistent prep. The variable that defeats full penetration on pipe is fit-up.

High-Chromium Austenitic Stainless
The Sunset Spectacular, a 67-foot stainless steel media tower by Orange Barrel Media, on the Sunset Strip at twilight

Fabricating the Sunset Spectacular

All 72 Ohio-built components assembled in West Hollywood with zero fit-up issues. The project won the 2021 Tekla North America BIM Award for Best Small Project and the 2017 AIA|LA Next LA Honor Award.

A 67-foot, 100-ton 304L stainless steel monocoque with 72 unique multi-ton panels, sharp corners that ruled out press brake forming, and no two faces parallel. As designed, the structure was considered unbuildable.

304L Stainless Steel
100-foot 304L stainless steel trough for wastewater treatment

A 100-foot stainless trough, straight within 1/8"

Delivered straight within 1/8 inch over 100 feet, tighter than spec. Installed without field rework.

Regional wastewater authority needed a 100-foot 304L stainless trough to replace a failed unit during a planned outage. Straightness was specified within 1/8 inch over the full 100-foot length. The previous fabricator couldn't hold tolerance over the span.