Case Studies

Power-generation ductwork that dry-fit on the first attempt, and a 100-foot wastewater trough held straighter than spec.

Documented builds

Each case study covers the requirement, how Northern built it, and the outcome the customer measured.

100-foot 304L stainless steel trough for wastewater treatment

A 100-foot stainless trough, straight within 1/8"

Regional wastewater authority needed a 100-foot 304L stainless trough to replace a failed unit during a planned outage. Straightness was specified within 1/8 inch over the full 100-foot length. The previous fabricator couldn't hold tolerance over the span.

Northern crew in front of a WESP collector tube bundle in the yard

A multi-row WESP in AL-6XN, every collector row straight within 1/8"

A pollution-control OEM needed a large WESP (wet electrostatic precipitator) built in AL-6XN: a multi-story collecting structure, roughly 17 feet tall, with collector rows stacked one above the next. Each row had to hold straight within 1/8 inch, and the tolerance stacked from the bottom up.

The Sunset Spectacular, a 67-foot stainless steel media tower by Orange Barrel Media, on the Sunset Strip at twilight

Fabricating the Sunset Spectacular

A 67-foot, 100-ton 304L stainless steel monocoque with 72 unique multi-ton panels, sharp corners that ruled out press brake forming, and no two faces parallel. As designed, the structure was considered unbuildable.

full-penetration circumferential weld on a stainless process pipe at Northern

Process pipe welds, full penetration on every joint

Every joint passed radiography against the piping-package acceptance criteria, with the welder and procedure stamped on each weld map.

A process-piping program needed full-penetration butt welds that would pass radiography on every joint, in a high-chromium austenitic stainless that punishes inconsistent prep. The variable that defeats full penetration on pipe is fit-up.

High-Chromium Austenitic Stainless

Have a build like these on your desk?

Send the drawing. Our engineers review the spec before we quote it.