Northern crew in front of a WESP collector tube bundle in the yard

A multi-row WESP in AL-6XN, every collector row straight within 1/8"

A multi-story WESP (wet electrostatic precipitator) in AL-6XN with every collector row held straight within 1/8 inch by controlling weld distortion.

  • AL-6XN Super-Austenitic Stainless

The Challenge

A pollution-control OEM needed a large WESP (wet electrostatic precipitator) built in AL-6XN: a multi-story collecting structure, roughly 17 feet tall, with collector rows stacked one above the next. Each row had to hold straight within 1/8 inch, and the tolerance stacked from the bottom up.

Our Approach

We treated straightness as the controlling fabrication parameter, set before the first arc rather than checked at the end, and managed cumulative distortion as the WESP went together so the super-austenitic plate held its geometry.

The Result

Every WESP collector row held straight within 1/8 inch. Welded to ASME BPVC Section IX qualified procedures, built to ISO 13920 weldment tolerance classes, and cleaned and passivated per ASTM A380 and A967.

Client Requirements

A pollution-control OEM needed a large WESP (wet electrostatic precipitator) built in AL-6XN, the super-austenitic stainless that survives wet-chloride and acid service where leaner grades pit through. The WESP collecting structure was multi-story, roughly 17 feet tall, with collector rows stacked one above the next. Each row had to hold straight within 1/8 inch. The hard part was not any single row. It was that the tolerance stacked from the bottom up: any drift in the first row carried into every row above it.

Northern’s Approach

We treated straightness as the controlling fabrication parameter, set before the first arc rather than measured at the end. AL-6XN work-hardens and reacts to heat, so the way to hold geometry on a tall thin-walled WESP is to predict the drift and manage cumulative distortion as the structure goes together, not to straighten it afterward.

Heat input was held low and controlled so the super-austenitic plate would not walk, and each row was brought to straight as it was built rather than corrected after the stack was complete. Welding followed ASME BPVC Section IX qualified procedures, with weld controls and PMI traceability matched to the alloy.

Outcome

Every WESP collector row held straight within 1/8 inch, built to ISO 13920 weldment tolerance classes. After fabrication, the structure was cleaned and passivated per ASTM A380 and A967 to restore the passive layer across the welds. Specialty-alloy work at this scale is unforgiving: a distortion mistake is measured in the cost of the plate, not the labor. Holding the geometry meant controlling distortion from the first row.

From the floor

Capabilities behind this build

The fabrication processes this project drew on. Each one is a service we run in-house.

Operator forming a stainless steel bracket on a CNC press brake at Northern Manufacturing, with laser-cut blanks staged beside the dies

Precision Bending and Forming Services

Five CNC press brakes, two Trumpf TruBend 5320s among them, form stainless from sheet gauges through heavy plate, with springback compensation set per grade and formed dimensions verified against your CAD model before parts move to welding.

Northern Manufacturing welder running a manual GTAW pass on a stainless steel heat exchanger tubesheet

Stainless Steel Welding Services

60+ AWS-certified welders running ASME BPVC Section IX qualified procedures across nine processes (GTAW, GMAW, FCAW, SAW, robotic, K-TIG, and more) on stainless, duplex, and nickel alloys.

Massive hexagonal honeycomb tube bundle standing inside the 55-foot spray pickling booth at Northern Manufacturing

Stainless Steel Pickling and Passivation

Welding leaves stainless with heat tint, free iron, and a chromium-depleted layer that fails service life if it ships out the door. We pickle and passivate to ASTM A380 and A967 in a 55 ft booth, and run copper-sulfate verification (ASTM A967 Practice D) when your specification or purchase order calls for it.

Industries this build serves

How Northern fabricates for the applications this project speaks to.

More documented builds

The requirement, the approach, and the measured result on other Northern projects.

full-penetration circumferential weld on a stainless process pipe at Northern

Process pipe welds, full penetration on every joint

Every joint passed radiography against the piping-package acceptance criteria, with the welder and procedure stamped on each weld map.

A process-piping program needed full-penetration butt welds that would pass radiography on every joint, in a high-chromium austenitic stainless that punishes inconsistent prep. The variable that defeats full penetration on pipe is fit-up.

High-Chromium Austenitic Stainless
The Sunset Spectacular, a 67-foot stainless steel media tower by Orange Barrel Media, on the Sunset Strip at twilight

Fabricating the Sunset Spectacular

All 72 Ohio-built components assembled in West Hollywood with zero fit-up issues. The project won the 2021 Tekla North America BIM Award for Best Small Project and the 2017 AIA|LA Next LA Honor Award.

A 67-foot, 100-ton 304L stainless steel monocoque with 72 unique multi-ton panels, sharp corners that ruled out press brake forming, and no two faces parallel. As designed, the structure was considered unbuildable.

304L Stainless Steel
large-diameter stainless exhaust duct with a conical end, staged in the Northern shop

Large-diameter exhaust duct sections that mated on the first attempt

Every section was dry-fit against its mating part in the shop and dropped onto the in-plant flanges on the first attempt, with no forced alignment and no field rework.

Power generation facility needed large-diameter stainless exhaust ductwork to mate to existing in-plant flanges during a scheduled outage, with zero tolerance for forced alignment on site.

304 Stainless Steel

Have a build like this on your desk?

Send the drawing. Our engineers review the spec before we quote it.

Loading